Providing Support for Long Lead Time Standard Logic Devices
100% Authorized and Guaranteed Devices
Standard Logic has been part of electronic design since the early days of the industry; through the evolution of Bipolar and CMOS technologies and with the constant advancements in package options. It has remained a staple in many designs ranging from small simple gates to complex logic functions. With this wide adoption and with current market conditions, the availability of many standard logic devices is being challenged by extended lead times.
Rochester Electronics is known for supporting extended lifecycle products but is also in a unique position to assist with long-lead-time products. Our partnership includes some of the top suppliers of standard logic products including Nexperia, ONSEMI, and Texas Instruments. Our inventory covers 750-million units comprised of over 20,000 part-number options. Also, as a licensed manufacturer, Rochester stocks wafer/die from the original manufacturers and can build additional inventory including products no longer found in the general market.
A key benefit of our broad logic offering is providing customers with options when long lead times are impacting manufacturing schedules. To mitigate constraints, many customers are opening up and reevaluating requirements. Generally, wider temperature and higher performance devices are viable options in many applications. In addition, date-code restrictions are being loosened with no detrimental effects.
To provide customers with options, Rochester inventory covers a full range of logic devices from basic logic gates, counters, adders, and flip-flops to bus interface logic and many others. With 60% of our inventory comprised of Active lifecycle devices, there is support for many of the latest low voltage and small package technologies along with continued support for technologies such as 5V tolerant families and many of the standard 5400/7400 logic types such as LS/ALS/AS, AC/ACT, ABT, FCT. The overall offering provides a broad range of packages, temperature, and performance options. Included in these are a selection of automotive, military, and aerospace-rated devices.
Search our Logic Portfolio: